
Krishna Kumar/ Nagaur. Mister. B. R. The college was facing the brunt of the dilapidated system, meanwhile all the staff and students of the college have come together. And brought it in better condition, let us tell you that the color was disappearing from the walls here. But when everyone thought of working together, the face of the college changed. Principal Harsukh Chharang told that when I joined the college as Principal, there was a shortage of many things in the college. So, keeping in mind the interests of the students, many construction works have been done in the college. In which there has also been cooperation of local people and Bhamashahs.
First of all, painting work was done in the college because the color of the walls in the college premises was deteriorating. After that, the dilapidated rooms were repaired. This year, more than 60 tree-guards and trees have been planted in the college. While other colleges of Rajasthan had all kinds of facilities, some things were lacking in the college of Nagaur.
Digital library constructed in college
For the first time, a stadium was constructed in the college, construction of a digital library (which is going to start soon after completion), construction of a canteen, construction of a track, the biggest problem in the college campus was the Shulabh Complex which has just been completed, this Some construction work has taken place this year. So many construction works in the college are looking dull because the promising girl students of the college have together spread the magic of their hands on the walls of the college.
Amazing paintings on the walls
Because here colorful paintings have been done on the college walls, which has happened for the first time in the history of the college. Here, painting on the main gate, painting on the walls of the college, in which the confluence of modern and Rajasthani culture can be seen.
Tags: Nagaur News, Local18
FIRST PUBLISHED: July 3, 2023, 12:34 IST